The Forge, Digbeth

Value - £1.85m | Main contractor - Wavensmere Homes

Built over six-storeys with a ground floor steel frame podium, The Forge in Digbeth is a stunning development of 140 luxury apartments in one- and two-bedroom residences, suitable for first time buyers and families alike.

The challenge:

  • Far from being a straightforward offsite SFS build, the project included ambitious complex balconies, a faceted façade, requiring a high level of experience and expertise is SFS construction techniques.

  • Time constraints were a major factor alongside environmental expectations so complete supply chain collaboration was required to ensure the best possible lead times and results.

  • Added to this were the tight city centre location, restricted access and difficult on-site logistics, thus requiring a high degree of logistical.

  • Lift panels were constructed in the same way control to ensure that materials were delivered to site as required.

The solution:

  • The complex shapes were dealt with by providing short straight sections of Metsec Metframe panels where required that created a faceted elevation to form an effective solution.

  • Pre-panelisation of the frames was undertaken at Mansell Building Solutions production facility in Manchester then delivered to site in the correct erection sequence.

  • The panels were delivered to site using just in time delivery methods and craned into position, with insulation and brick ties then fitted.

  • Lift panels were constructed in the same way control to ensure that materials were delivered, and steel staircases and bathroom pods were incorporated into the frame as construction progressed.

  • Metal decking was then installed with additional rebar and anti-crack mesh and concrete poured to form a floor.

  • This process was repeated, floor by floor, until roof level was reached whereupon a Metsec Roof Cassette, pre-lined with 18mm OSB, was then installed.

The benefits:

  • With the majority of the fabrication off-site, on-site erection was delivered in a fast and effective manner and construction timescales were cut by 30%.

  • Mansell Building Solutions effectively managed the erection sequence and the use of just-in-time delivery methods reduced the number of deliveries to site.

  • Mansell Building Solutions is one of Metsec’s preferred installers, so have worked closely in partnership for many years and this partnership approach was crucial to the success of this installation.

  • With high quality and tolerances, the solution effectively delivered zero waste on site, overall waste was reduced by 25% over the build and a decrease in weight of over 70%, compared to traditional on-site construction, resulted in a significantly reduced transportation impact.

  • Mansell Building Solutions completed their works ahead of schedule allowing earlier completion.